N O T I C E
January 4 - 4:00pm -Jan
5 - 4:00 am 2007
DUKE HOSPITAL LOADING DOCK CLOSED
Please be advised that access to the Loading
Dock at Duke Hospital will be closed from
Thursday, Jan. 4th, 4:00pm until Friday, Jan.
5th, 4:00am.
Make sure your vehicles are out by Thursday,
Jan. 4th, 4:00pm or they will not be able to get
out until the next morning.
(Steve Robinson, please coordinate the
Laundry trucks and MM vehicles.)
FMD will be digging up the road to make
connections to the chilled water loop.
|
|
N O T I C E
December 12, 2006 SHUTDOWN
JONES BUILDING
TO:
JONES BUILDING OCCUPANTS
SUBJECT: SCHEDULED DOMESTIC HOT WATER
SHUTDOWN
A domestic
hot water shutdown is scheduled for Tuesday,
December 12th, 2006 beginning at
6:30 a.m. and lasting until 7:30 a.m. This
shutdown is necessary to repair the hot water
converter.
ALL
BUILDING DOMESTIC HOT WATER WILL BE OFF DURING
THIS PERIOD.
We
appreciate your cooperation in this matter. If
there are any questions, please call either
James Adams or Linwood Keith at 684-5799.
|
|
N O T I C E
December 12, 2006 SHUTDOWN
DUKE CLINIC
To: Occupants of Duke Clinic
Main Entrance Bldg. , X-ray
equipment (Red Zone)
Gerontology and D&T (Blue Zone)
ALL FLOORS each area
From: Robert Guerry, Director,
engineering & Operations
Subject: Short Normal Power Interruptions
An interruption to normal power has been scheduled
for Tuesday, December 12, 2006 beginning at
5:30 am and continuing until 6:00 am for a
total duration of ½ hours. This interruption is
necessary to perform work on the high voltage switch
gear serving the Main Entrance Building, D&T,
Gerontology and CR1.
·
Utilities connected to normal power,
such as lights and receptacles will be off during
this interruption.
·
AS A PRECAUTION, PLEASE TURN OFF
ALL COMPUTERS DURING THIS SHUTDOWN.
·
All major equipment, including
heating, ventilation and air conditioning will be
OFF during this interruption.
·
Domestic hot and cold water, medical
gasses and the fire system will NOT be
affected.
·
Main Entrance
Building/Gerontology/D&T/ and CR1, all floors will
be affected by this normal power outage.
Maintenance personnel will be on duty during this
interruption, please call 684-3232 if assistance is
needed. Questions or concerns should be addressed to
Calvin Hicks, Clinic Utility Foreman at 684-3701 or
hicks@032@mc.duke.edu.
Thank you for your cooperation in this matter
|
N O T I C E
November 3-4 1006 SHUTDOWNS
TO:
VIVARIUM BUILDING OCCUPANTS
SUBJECT: SCHEDULED ELECTRICAL
INTERRUPTIONS
There will
be TWO Electrical interruptions
for 15 minutes each,
and will ONLY affect the GREEN and
YELLOW Hall Areas.
The
interruptions will be as
follows:
1)
Friday, Nov. 3, 2006 beginning at 7:00 a.m.
2) Saturday,
Nov. 4, 2006 beginning at 12:00 noon
These
interruptions are necessary to upgrade the
building electrical utility system.
We
appreciate your cooperation in this matter. If
there are any questions, please call Linwood
Keith at 684-4194 or 684-5799.
|
|
N O T I C E
November 17 1006 SHUTDOWNS
To: Duke Clinic Occupants
From: Robert
Guerry, Director, Engineering & Operations
Date of
Interruption: Friday, November 17, 2006
Subject: Scheduled Service
Interruption:
Domestic HOT and COLD
WATER
There will be a scheduled interruption of domestic
hot and cold water on Friday, November 17, 2006,
beginning 10:00 PM and continuing until 2:00 AM
a duration of 4 hours. This interruption is
necessary for repairing water systems.
All other services such as air conditioning, heat,
electrical power will remain in operation.
Areas affected:
Red Zone ALL FLOORS
Maintenance personnel will be on duty during this
interruption, please call 684-3232 if assistance is
needed. Questions or concerns should be addressed to
Calvin Hicks, Clinic Utility Foreman at 684-3701 or
hicks032@mc.duke.edu.
Thank you for your cooperation in this matter
|
|
N O T I C E
November 17 1006 SHUTDOWNS
To: Duke Clinic Occupants
From: Robert Guerry,
Director, Engineering & Operations
Date of
Interruption: Friday, November 17, 2006
Subject: Medical Air System
Service Interruption
There will be a scheduled interruption of Medical
Air on Friday, November 17, 2006 at 10:00 PM and
continuing until 11:00 PM for a duration of one
hour. This interruption is necessary to make repairs
to the existing medical air system.
Areas affected:
Red, Green, Purple, yellow, Orange, Brown ALL
FLOORS
Maintenance personnel will be on duty during this
interruption, please call 684-3232 if assistance is
needed. Questions or concerns should be addressed to
Calvin Hicks, Clinic Utility Foreman at 684-3701 or
hicks032@mc.duke.edu.
Thank you for your cooperation in this matter
|
N O T I C E
October 30, 2006
TO:
LENOX BAKER CHILDREN’S HOSPITAL BUILDING
OCCUPANTS
SUBJECT: SCHEDULED WATER
SHUTDOWN
All building
water will be turned off on Monday, Oct. 30,
2006 beginning at 7:00 a.m. and
lasting approximately 30 minutes. This
shutdown is to allow the City of Durham to
install a new water meter at the Hospital.
Your
patience during this period is greatly
appreciated.
ALL
BUILDING WATER WILL BE OFF DURING THIS PERIOD.
THANK YOU,
LINWOOD KEITH
ENGINEERING AND OPERATIONS
MAINTENANCE FORMAN
684-5799
|
|
N O T I C E
Nov. 1, 2006
October 23, 2006
To: Occupants of Duke Clinic
Main Entrance Bldg., X-ray
equipment (Red Zone)
Gerontology and D&T (Blue Zone)
Cath Lab
All Floors each area
From: Robert Guerry, Director,
engineering & Operations
Subject: Short Normal Power Interruptions
An interruption to normal power has been scheduled
for Wednesday, November 1, 2006, beginning at 5:30
AM and continuing until 6:00 AM for a total duration
of ½ hours. This interruption is necessary to
perform work on the high voltage switch gear serving
the Main Entrance Building, D&T, Gerontology, CR1
and Cath Lab.
·
Utilities connected to normal power,
such as lights and receptacles will be off during
this interruption.
·
AS A PRECAUTION, PLEASE TURN OFF
ALL COMPUTES DURING THIS SHUTDOWN.
·
All major equipment, including
heating, ventilation and air conditioning will be
OFF during this interruption.
·
Domestic hot and cold water, medical
gasses and the fire system will NOT be
affected.
·
Main Entrance Building/Gerontology
/D&T/CR 1/ Cath Lab, all floors will be
affected by this normal power outage.
Maintenance personnel will be on duty during this
interruption, please call 684-3232 if assistance is
needed. Questions or concerns should be addressed to
Calvin Hicks, Clinic Utility Foreman at 684-3701 or
hicks032@mc.duke.edu.
Thank you for your cooperation in this matter
|
N O T I C E
Oct. 25, 2006
The Duke Hospital North fire pump will be off
line from 10:00 AM until 4:00 PM on Wednesday ,
October 25. Hot work (cutting, grinding,
soldering, brazing, welding etc.) WILL NOT BE
ALLOWED during this shutdown. This will
affect the bed towers (7546) , the ancillary
(7547) and e-core (7573).
If there is an emergency that requires hot
work to be performed , please contact OESO Fire
and Safety Division 684-5609 .
Thank you,
Steve Robinson
DHN Plumbing Foreman
Voice: (919)681-4261
Radio: 681-7571 @ tone 700414
pager:970-3372
Fax: (919)681-7838
email: steve.robinson@duke.edu
|
|
N O T I C E
Oct. 23, 2006
TO: CCIF AND SORF
BUILDING OCCUPANTS
SUBJECT: SCHEDULED
COMPRESSED LAB AIR SHUTDOWN
A Compressed
Lab Air shutdown is scheduled for Monday,
Oct. 23, 2006 beginning at 7:30 a.m. and
lasting the entire week. This shutdown is
necessary to install a new air compressor unit.
If
compressed air is needed in a fume hood or
safety cabinet, the Investigators will need to
use a portable source.
ALL
COMPRESSED LAB AIR WILL BE OFF DURING THIS
PERIOD.
We
appreciate your cooperation in this matter. If
there are any questions, please contact Robert
Hart at 684-3763.
|
|
N O T I C E
Oct. 20, 2006
To: Occupants of Duke Clinic
From: Robert Guerry, Director,
engineering & Operations
Subject: Short Normal Power Interruptions
Short normal power interruptions will occur
Friday, October 20, 2006 beginning at 7:00 pm
and continuing until 12:00 midnight. This is to
be a 5-hour time period. This outage is necessary to
make repair to the Control Circuitry to the High
Voltage Switch Board.
Areas affected by these Interruptions
·
7th floor: Green Zone
·
6th floor: Green Zone
·
5th floor: Green, Purple,
Yellow, and Orange Zone
·
4th floor: Green, Purple,
Yellow, and Orange Zone
·
3rd floor: Green, Purple,
Yellow, and Orange Zone; and Clinics 3-J and 3-K
·
2nd floor: Green Zone,
Clinics 2-F, 2-G, 2-H, 2-J, 2-K, 2-L, 2-M, and 2-P
·
1st floor: Green Zone, 1-E,
1-F, 1-G, 1-I, 1-J, 1-K, and 1-L
·
Basement: Green , Purple, Yellow, and
Orange Zone
·
Sub-basement: Student Health, MRI
area, Environmental Services, Dietary and
Pyxismanager
Maintenance personnel will be on duty during this
interruption, please call 684-3232 if assistance is
needed. Questions or concerns should be addressed to
Calvin Hicks, Clinic Utility Foreman at 584-3701 or
hicks@032@mc.duke.edu.
|
| |
EMERGENCY
STEAM
SHUT DOWN -09/18/06
TO:
OCCUPANTS OF THE FOLLOWING
BUILDINGS: JONES * SANDS * CARL * MSRB * BRYAN *
MUDD EYE CENTER AND EYE CENTER ADDITION
An emergency steam shutdown
is scheduled for Monday, September 18, 2006 at
5:00 p.m. and will last approximately 6 to 8
hours. This shutdown is necessary to repair a
leak on the high pressure steam line.
ALL STEAM WILL BE OFF DURING THIS PERIOD.
DOMESTIC HOT WATER, STERILIZERS AND WASHERS WILL
BE AFFECTED.
We appreciate your
cooperation in this matter. If there are any
questions, please call Linwood Keith at
684-5799.
|
|
N O T I C E
Bryan
Reserach Laboratory
Occupants Scheduled Steam Shutdown
September 12, 2006
TO:
BRYAN RESEARCH LABORATORY OCCUPANTS
SUBJECT: SCHEDULED STEAM
SHUTDOWN
A
steam shutdown is scheduled for Tuesday, Sept.
12, 2006 beginning at 7:00 p.m. and lasting
until 12:00 midnight. This shutdown is necessary
to repair a leak on the high pressure steam
line.
ALL STEAM
WILL BE OFF DURING THIS PERIOD. DOMESTIC HOT
WATER, STERILIZERS AND WASHERS WILL BE AFFECTED.
We appreciate
your cooperation in this matter. If there are
any questions, please call either James Adams or
Linwood Keith at 684-5799.
|
|